Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  1. Fields that cannot be mapped via CSV include: Schedule Type, Work(h), Predecessor, Parent-Child relation, Constraint Date, Constraint Type, Priority, State, Start (Actual), Finish (Actual), Cost (Est, Material), Cost (Fixed).
  2. If Both Start and Finish dates are specified, then the task created is manually scheduled.
    If Duration is specified, then the task created is auto-scheduled.
    If the system cannot determine the schedule mode from what the user has entered, it will use the user’s preferences to create the task.
    For more details, refer the table at the last of the page.